Engineered for the application
Coat tooling carts, handling frames, workstations, storage systems and aerospace facility equipment where approved.
Industries
Coating review for aerospace factory fixtures, maintenance stands and ground-support frames.
Aerospace manufacturers and MRO suppliers need to identify whether a component is tooling, ground support or controlled aircraft hardware before selecting a finish. PPC reviews eligible factory and maintenance fabrications with attention to fixture contact points, handling damage and the customer's documentation requirements. The drawing's finish callout governs the proposed process.

Show datum pads, locating pins, clamp faces and other no-coat zones. Agree rack contact points, film thickness and the allowed appearance on working versus visible surfaces. First-article inspection should establish that coating and cure do not compromise the fixture's intended fit.
Identify the substrate and any material or assembly restrictions on heat exposure. Where permitted, select the coating around handling, cleaners, colour identification and repair expectations. A fixture drawing should show which surfaces locate or contact the workpiece so they are not treated as decorative faces.
Agree measurement locations around corners, welds and masked boundaries. Include any first-article fit verification and documentation required by the customer. Separate a tooling finish approval from aircraft-hardware qualification so the accepted manufacturing scope is clear at every release.
An ISO 9001 quality system does not by itself establish AS9100 certification, NADCAP accreditation or an aircraft manufacturer's process approval. Flight hardware and controlled materials require explicit approval and evidence before any commitment.
How PPC supports your project
PPC approaches each requirement as part of a larger manufacturing schedule: the right coating, practical production planning, consistent quality and cost-conscious decisions from quotation to delivery.
Coat tooling carts, handling frames, workstations, storage systems and aerospace facility equipment where approved.
Coordinate fabrication batches with plant installation and assembly schedules, keeping functional interfaces protected.
Control adhesion, film build, masking and inspection records against purchaser-supplied specifications. PPC works to align the proposed process with quality targets, commercial constraints and agreed timelines.
Share drawings, quantities, finish requirements, budget priorities and delivery dates. Our team can help identify the most practical path forward.
For Aerospace Industry components, start with these project details. Our team can help identify what is still needed.
It can be suitable for eligible non-flight tooling when the specified finish, cure temperature and critical interfaces are compatible. The responsible manufacturer must approve any required process qualification.
Contact us today to transform your products with our expertise, facilities, and commitment to quality.